Building the Temporary Pool Cover
Sunday, December 7th, 2008After gloating over the Edmonton Oiler’s win over the San Jose Sharks last night, Paul and Bryan were on the project site fairly early on Sunday morning.
We had to get some supplies from Ace Hardware (go figure) and then started in earnest.
Our plan was to make the ‘box’ first, and then fill in the joists and put the 1×4 strings on the bottom of the joists.
It was a struggle but we managed to fit the 3/4 inch tongue and groove plywood deck and complete the first panel.
The second panel was a much more difficult to build as the plywood was warped.
It was getting dark, but we were pleased with our progress during the day.