We completed the west window bay of the temporary site office today. After returning today with the 6 ft. level and finding that, yes, the framing was square, we completed the window.

Ready for windows.

Ready for windows.

As well, the final 4×8 sheet of plywood was tucked into the south-east corner of the decking and screwed down. I convinced Paul Fulton to drop by the site and give me a hand positioning the plywood (more problems with the the tongue and groove. The deck is now complete (and the pipe is even painted florescent orange for safely).

Completed deck.

Completed deck.

Just as I was about to leave the site, Matt Jung of 88HVAC returned my call.  We discussed the visit to Hi-Velocity Systems in Edmonton and how I was impressed with their product line.  Matt asked about the final radiant design and then asked me to visit a job site in Hillsborough on Monday.  He said that it would help to understand the alternatives that we are considering so we can finalize the design.

Monday will be a busy day.

Leave a Reply

Your email address will not be published. Required fields are marked *