Placing High Load 40 Styrofoam

With the 3/4 inch crushed rock groomed for the plumbing drains and the corresponding compaction completed, the crew placed the Dow High Load 40 rigid styrofoam in place.  After taping, they will prepare the Pre-Prufe waterproofing membrane over the styrofoam sheets.

Laying out Dow High Load 40 rigid styrofoam.

Laying out Dow High Load 40 rigid styrofoam.

Bryan and his father drilled a hole and put the 10 ft pole on the temporary site office so it can support the Davis weather station.  This was a two-person job that had to be completed before John returns to winter in Edmonton, Canada.

Pole on temporary site office for Davis weather station.

Pole on temporary site office for Davis weather station.

Bryan’s father, John, struggles with a smile, knowing he returns to Edmonton, Canada tomorrow where it truly is winter!

John on the project site, knowing it is back to Canada tomorrow!

John on the project site, knowing it is back to Canada tomorrow!

Leave a Reply

Your email address will not be published. Required fields are marked *