Ready to Shotcrete Vertical Walls

The foundation walls on the east and west sides will be ‘blind side’ formed, with only one side of the wall having a removable form.  This will be the same as the bottom four feet of the north and south walls.

To have the appropriate vertical face for the blind side application, our contractor, Bill Brown, uses shotcrete to form a smooth face.  The vertical earth walls were covered with wire mesh for the shotcrete mixture to attach to.

East wall, ready for shotcrete.

East wall, ready for shotcrete.

Leave a Reply

Your email address will not be published. Required fields are marked *