Archive for April 25th, 2009

Distributing and Compacting Stockpiled Soil

Saturday, April 25th, 2009

The dirt that was delivered at the end of Friday and stockpiled by the gate was distributed and compacted in 8 inch lifts today. 

We have two issues to follow up on for Monday – the first is the Simpson GLBT brackets that are being set in the top of the concrete feature walls, and the second issue is to confirm with Duquette Engineering that two bars that were added at the top right of the HVAC duct under the garage door.

All Remaining Soil Now Distributed and Compacted

The soil at the front of the property was distributed and compacted today.  There were only two workers, who enjoyed the sunny, but cool, weather today to distribute the soil in 8 inch lifts and then compact it.

Compacting the soil in front of the garage.

Compacting the soil in front of the garage.

(more…)