Managing the Job Site

It was a beautiful blue-sky, California day today.  A dirigible appeared in the sunshine, circling over Los Gatos and the Santa Cruz Mountains.

Dirigible flying over Los Gatos.

Dirigible flying over Los Gatos.

Discussion with Matt Jung

Matt Jung from 88HVAC met Bryan at the job site to discuss the geothermal and radiant heating requirements and timing.  The last time Matt was at the site was in November 2008 so a lot had changed since them.

We need to establish all ducting requirements prior to completing the concrete walls.

Sweeping Up

Kate and Nik arrived in the late afternoon to help prepare for the week ahead.

Kate sweeping the concrete.

Kate, pretty in pink, sweeping the concrete.

Pockets and Hold Downs

Just before leaving, we photographed the pockets and hold downs around the site today.  Bill Brown scheduled the shotcrete for Wednesday, April 8 so everything has to be in place prior to the inspection on Monday afternoon, April 6.

Pocket with hold downs.

Pocket with hold downs on west side of Window Well.

Pocket and hold downs on east corner of window well.

Pocket and hold downs on east corner of Window Well.

Large pocket for W14x43 drop beam on south retaining wall.

Large pocket for W14x43 drop beam on south retaining wall.

Raised curb around where hollow core concrete panel bridge will sit over the stair well.

Raised curb around where hollow core concrete panel bridge will sit over the stair well.

Pocket for W10x12 drop beam behind west wall of stair well.

Pocket for W10x12 drop beam behind west wall of stair well.

Stair well, ready for inspection.

Stair well, ready for inspection.