Setting Up the Conveyors
Thursday, May 14th, 2009Now, we need to have the conveyors in place to move the dirt into the void at the back of the excavation. And, we need to place the final two small pieces of hollow core concrete panels that will make our third bridge, over the exterior stairs. Plus, we had a couple visitors.
Setting Up the Conveyors
We’re using two conveyors to move 120+ cubic yards of dirt from the front of the site to the back of the excavation. It will be nice to get the dirt moved so we can have a much safer site.
Final Two Pieces of Hollow Core Concrete Panels in Place
We placed the final two pieces of hollow core concrete panels to form the thrid bridge on our site. It looks great!

The small, remote control crane made it easy to tuck these two pieces of hollow core concrete panels in place today.
Menhardt Visitors
Wido and his son, Matts, visited our site today. It is always good to have friends check in and see our progress!