Setting Up the Conveyors

Now, we need to have the conveyors in place to move the dirt into the void at the back of the excavation.  And, we need to place the final two small pieces of hollow core concrete panels that will make our third bridge, over the exterior stairs.  Plus, we had a couple visitors.

Setting Up the Conveyors

We’re using two conveyors to move 120+ cubic yards of dirt from the front of the site to the back of the excavation.  It will be nice to get the dirt moved so we can have a much safer site.

Our friends from Summit Cranes arrive, right on time.

Our friends from Summit Cranes arrive, right on time.

The remote control crane operator ...

The remote control crane operator …

First conveyor in place. Excellent!

First conveyor in place. Excellent!

Picking up the second conveyor.

Picking up the second conveyor.

The remote control is way cool ...

The remote control is way cool …

Final Two Pieces of Hollow Core Concrete Panels in Place

We placed the final two pieces of hollow core concrete panels to form the thrid bridge on our site.  It looks great!

The small, remote control crane made it easy to tuck these two pieces of hollow core concrete panels in place today.

The small, remote control crane made it easy to tuck these two pieces of hollow core concrete panels in place today.

Our third bridge is looking great!

Our third bridge is looking great!

View of bridge from bottom.

View of bridge from bottom.

Menhardt Visitors

Wido and his son, Matts, visited our site today.  It is always good to have friends check in and see our progress!

Matts and his father, Wido, in the kitchen.

Matts and his father, Wido, in the kitchen.Nik approves!

Nik approves!

Nik approves!

Leave a Reply

Your email address will not be published. Required fields are marked *