Testing Soil Compaction

Our soil compaction was to be completed to at least 90%

It was.

Soil Compaction

Our soils report stated, ‘The drainage material and the clayey soil cap should be placed in layers about 6 inches thick and moderately compacted by hand-operated equipment to eliminate voids and to minimize post-construction settlement.’

We engaged HP Inspections to test our soil compaction throughout the backfill process, which they did.

Today, the final testing was completed.

We’re good.

HP Inspections testing the soil compaction.

HP Inspections testing the soil compaction.

The inspector came armed with a CPN MC-3 Portaprobe.

The inspector came armed with a CPN MC-3 Portaprobe.