Completing the Bridges and Stairs
Friday, September 18th, 2009Monday will be a big day. The two bridges and the stairs are loaded on Larson Steel’s truck in Gilroy and will be delivered to the project site by 8:00 am on Monday morning. Our friends from Summit Crane will have a 45 ton crane at the project site to put the stairs and bridges in place. And, HP Inspections will be verifying the welding at 1:00 pm on Monday afternoon.
It’s good. All good.
Completed Bridges
Hector showed me the bridges are loaded on their truck. Very cool.

Larson Steel's truck, with the two bridges and stairs loaded and ready for delivery and installation on Monday morning.

Everything looks good. Note the HSS 4x4x 3/8 column tucked in the bridge. This is one of two structural columns that will be visible in th house.
Monday will be a big day.



