Re-Engaging Bill Brown Construction
Monday, November 9th, 2009We had to put our project on ‘hold’ for several months while we had our interior stairs and two bridges, with the corresponding posts and railing systems designed, engineered, approved, fabricated, installed and inspected. Then, the stainless steel posts had to be welded to the steel beams in the house.
Having completed those items, we re-engaged Bill Brown Construction to complete pouring the 5+ inches of concrete on the main floor and the 3 inches of concrete in the lower floor (basement).
Cleaning Up the Site and Setting Forms
Bill Brown’s team arrived on site and started working on ensuring all the forms were in the correct position. After several months, some of the forms had moved a bit so they needed some adjustments. With three people working, the cleanup was done quickly.