Shipping Our SIPs and the Walters Visit Our Site

Bryan received a call today from Bill Edwards of Insulspan.  Bill apologized for interrupting our tool shopping on ‘Black Friday’ (we bought an air compressor and a DeWalt miter saw) as he wanted to advise us that our SIPs will arrive at our job site on Wednesday morning (12/02/09) at 8:00 am.

Shipping Our SIPs

Bill explained that there will be three trucks; two truckloads full of SIPs and the third truck will have the remaining SIPs and all the hardware.  He sent the photos below to show us what to expect.

We need to ensure we have a crane ready and waiting, and that we have space to store the SIPs until we can place the SIPs on the structural framing.

Once we have the SIPs, the house should come together quickly.

Our SIPs in Delta, BC (Vancouver) loaded and ready to go on Friday, 11/27.

Our SIPs in Delta, BC (Vancouver) loaded and ready to go on Friday, 11/27/09.

Back of the truck.  Note the reference numbers on each panel.

Back of the truck. Note the reference numbers on each panel.

Truck #2, with more SIPs.

Truck #2, with more SIPs.

Front of truck #2.

Front of truck #2.

The Walters Visit Our Site

It was a great Thanksgiving dinner last night and, yes, we discussed our project several times.  Worth and Lena Walters were at the dinner with their two sons, Bjorn and Andreas.  Everyone, except Bjorn, has visited our project site and, during a lull in their Black Friday shopping, they called and said they would drop by.

Jo-Anne wanted to verify the progress so she joined us, too.

The Walters inspecting progress since their last visit.

The Walters inspecting progress since their last visit.

The lower level is looking fine - we need to pour concrete!

The lower level is looking fine - we need to pour concrete!