Taking Field Measurements for Our Steel Beam in the Roof

There is one steel flush beam in our roof, which will not be visible.  However, this beam connects many of the key structural components together in the house and must be fabricated to very fine tolerances so it will fit into the SIP roof assembly and connect the components as designed.

Given it was a beautiful Friday afternoon, Reed Kingston stopped by with his two boys, Graham and Cole, to see the progress.  And walk around the roof!

Taking Field Measurements

We are putting a W8x18 steel flush beam into the SIP that connects the concrete wall in the Garage/Atrium with the 7.00 x 11.25 inch Paralam flush beam by the Living Room. 

This steel beam will have:

  • 2×6 nailers on the top and bottom, with Nelson studs connecting the nailers to the steel beam;
  • a hole in the top and bottom flange to connect the beam to a 5/8-inch anchor bolt that is embedded in the concrete wall;
  • six CS14 straps to connect the steel beam to the concrete shear wall;
  • a Simpson GLT welded to the north end of the steel beam to connect it to the 7.00 x 11.25 Paralam flush beam;
  • four sets of plates welded to the flanges of the steel beam to connect to the 4×6 and 6×6 posts that support the upper-flat roof; and
  • four bolts connecting the steel beam to the HSS 4×4 steek column in the Kitchen.

Yeah, there is a lot going on with this beam.

(We better get it right!)

Cole and Graham Kingston Visit Our Project Site

Reed Kingston brought his twin boys, Cole and Graham, to the project site this afternoon.  All three of the boys tour the site on a regular basis so they have a good understanding of where we were and how the projects unfolds.

William (left), from Larson Steel, and Francisco (right), from Earth Bound Homes, review the structural plans and identify the various connections for this beam.

William Zapeda (left), from Larson Steel, and Francisco Espinoz (right), from Earth Bound Homes, review the structural plans and identify the various connections for this beam.

William Zepeda, from Larson Steel, measuring the HSS 4x4 steel column in the Kitchen.

William Zepeda, from Larson Steel, measuring the HSS 4x4 steel column in the Kitchen.

Francisco Espinoz, Earth Bound Homes, measuring the W8x18 steel beam over the concrete wall in the Garage/Atrium.  The CS14 straps will go over and under the nailers that will be attached to the steel beam.

Francisco Espinoz, Earth Bound Homes, measuring the W8x18 steel beam over the concrete wall in the Garage/Atrium. The CS14 straps will go over and under the nailers that will be attached to the steel beam.

Reed Kingston with his two boys, Cole and Graham, went to each corner of the roof as they reviewed progress to date.

Reed Kingston with his two boys, Cole and Graham, went to each corner of the roof as they reviewed progress to date.

The FSC-certified LVL is now inside of SIP panels around the perimeter of the lower-flat roof.

The FSC-certified LVL is now inside of SIP panels around the perimeter of the lower-flat roof.

SIP roof over main entrance with LVL inside of SIP.

SIP roof over main entrance with LVL inside of SIP.

West side of front of house.  Note the window well to bring light into the lower level (and allow emergency egress).

West side of front of house. Note the window well to bring light into the lower level (and allow emergency egress).

The week ended on another beautiful, blue-sky California day.  The weather was the complete opposite of the torrential rains exactly one week ago today.