Back in the U.S.A.

After a week in Argentina, we arrived back in the U.S.A. today.

While we had a great time in Argentina, it is good to be back at the job site to see how things are progressing.  And, to manage that progress.

After unpacking, Bryan did a quick tour of the job site and saw the progress that had been made this week.

The floor in the Kitchen is covered with water. That is ok as we will have a roof very soon.

The floor in the Kitchen is covered with water. That is ok as we will have a roof very soon.

The posts are in place around the Atrium now. There will be Simpson CCQs and ECCQs on the tops of each of the posts.

The posts are in place around the Atrium now. There will be Simpson CCQs and ECCQs on the tops of each of the posts; one ECCQ is in place over the 6×6 post in the center of the Atrium.

The South side of the North gable SIP roof is in place. The North side will be completed this week.

The South side of the North gable SIP roof is in place. The North side will be completed this week.