Documenting Our Construction Progress
Monday, July 5th, 2010We took a few minutes to walk around the project site (interior and roof), taking pictures that document our progress to date.
Having these photos available will help us to focus our efforts on continuing to refine our comprehensive PERT chart.

View of Master Bedroom with emergency egress window on right. Note the existing 2x4 West wall was increased to a 2x6 wall.

View of Master Closet (right) and Master Vanity (left). The door height will be framed to 86 inches from finished floor (equal to the bottom of the beams).

View of Master Bath. Skylights will be larger to allow more light into the bathrooms. Pony wall by Shower will be reduced in size and replaced with glass wall. Freestanding soaking tub to go under window at left.

East side of East Gable. The gable roof must be extended to the Lower Roof deck and fireblocked every 10 feet.

South Gable, looking East. Note the bottom of the SIP roof must be extended to the Lower Flat Roof deck and fireblocked every 10 feet.