Summarizing Our Construction Progress for the Week

It was a beautiful, blue-sky California day.  The morning fog lifted around mid-morning, leaving a warm, but not too hot, day.

Perfect for documenting our progress at the job site this week.

Putting Down a Deposit on a Nissan LEAF

We had some friends over for dinner, including Mike Calise.  Mike is with EVadvise, which is an consultancy firm that focuses on electric vehicles (EV).  Mike explained the benefits of electric vehicles to us and, after a bottle of wine (Chardonnay?), we went to the Nissan LEAF web site and put down a deposit to reserve an all-electric Nissan LEAF.

In California, there are special high occupancy vehicle lanes (known as carpool lanes or, as Nik and Kate say, ‘diamond lanes’) that only vehicles with more than a stated number of people can use.  In most areas, high occupancy vehicles have two or more people in the vehicle.  On most roads, the carpool lanes only allow HOVs from 6:00 am to 9:00 am and from 3:00 pm to 9:00 am. 

Carpool lane sticker.  The ticket to driving in the carpool lanes.

To promote the adoption of hybrid vehicles, such as the Toyota Prius, the (Great) State of California passed a law allowing a limited number of hybrid vehicles with only the driver in the vehicle to use the carpool lanes regardless of the time of day.  These vehicles have yellow stickers, signifying they can be in the carpool lanes at any time.  The stickers expire on January 1, 2011 so in only five months there will be 85,000 more vehicles in the non-carpool lanes.

However, the legislators are considering changing the laws to allow all-electric vehicles, such as the Nissan LEAF, to use the carpool lanes.

Considering we missed buying a vehicle with yellow stickers, we certainly want to buy a vehicle that is allowed to use the carpool lanes.  This is an opportunity that we simply cannot miss.

Summary
 

Trenching

  • Sewer connection inspected and passed, and backfilled
  • Sewer to garage and South West corner of house completed
  • Connection to San Jose Water meter completed; inspection by the City of Monte Sereno on Monday afternoon (08/02/10)
  • Trench from underground cistern to storm sewer connection completed to sidewalk on Winchester
  • Trench to fill/overflow stubs for underground cistern completed 

Roof

  • All four (4) skylight curbs completed
  • Upper flat roof fascia completed
  • Two (2) of five (5) gable fascia ends completed
  • Twenty (20) linear feet of one hundred (100) linear feet of gable to flat roof connections completed

 

Our PERT chart, showing the remaining items to be completed before we can install the tapered foam roof crickets.

Our PERT chart, showing the remaining items to be completed before we can install the tapered foam roof crickets.

 

 

The trench from San Jose Water Company meter to the house was completed, with the 1-1/4 inch pipe installed.  The City of Monte Sereno will inspect this connection on Monday afternoon so we can backfill this trench.

The trench from San Jose Water Company meter to the house was completed, with the white 1-1/4 inch pipe installed. The City of Monte Sereno will inspect this connection on Monday afternoon so we can backfill this trench.

 

 

This congested trench area shows the water supply line (white 1-1/4 inch pipe) coming from the San Jose Water meter, and how it will be at least three (3) feet from PG&E's natural gas and electric services.

This congested trench area shows the water supply line (white 1-1/4 inch pipe) coming from the San Jose Water meter, and how it will be at least three (3) feet from PG&E

 

 

View of North East section of pool, showing completed trench to pool equipment (view unobstructed without the Hollywood Juniper).

View of North East section of pool, showing completed trench to pool equipment (view unobstructed without the Hollywood Juniper).

 

 

North end of South gable, which has been filled in with plywood.  Note the electrical conduit for the solar panels needs to be installed at the left side of the lower flat roof.

North end of South gable, which has been filled in with plywood. Note the electrical conduit for the solar panels needs to be installed at the left side of the lower flat roof.

 

 

Fully insulated (and enlarged) skylight curb completed on lower flat roof.

Fully insulated (and enlarged) skylight curb completed on lower flat roof.

 

 

There are three design details for the fascia:  the Upper Flat Roof fascia; Gable Roof fascia; and Lower Flat Roof fascia.

There are three design details for the fascia: the Upper Flat Roof fascia; Gable Roof fascia; and Lower Flat Roof fascia.

 

 

The Upper Flat Roof fascia has two (2) 2x8s with a one-inch space between them.  The fascia must extend above and below the SIP roof.  This fascia will be covered with natural zinc.

The Upper Flat Roof fascia has two (2) 2x8s with a one-inch space between them. The fascia must extend above and below the SIP roof. This fascia will be covered with natural zinc.

 

 

Upper Flat Roof fascia completed, showing the one-inch gap between the 2x6s.

Upper Flat Roof fascia completed, showing the one-inch gap between the 2x6s.

 

 

Under side of Upper Flat Roof, showing the detail where the remilled redwood will be.  Note the 2x6 will be covered with natural zinc.

Under side of Upper Flat Roof, showing the detail where the remilled redwood will be. Note the 2x6 will be covered with natural zinc.

 

 

The fascia for the Gable Roof consists of two (2) 2x8s.  There will be an air gap in the Gable Roof for a radiant heat barrier.

The fascia for the Gable Roof consists of two (2) 2x8s. There will be an air gap in the Gable Roof for a radiant heat barrier.

 

 

Fascia completed on West side of North Gable.

Fascia completed on West side of North Gable.

 

 

Detial on Gable Roof fascia (South West side of East gable).

Detail on Gable Roof fascia (South West side of East gable).