Coring Through Our Concrete – Day 2

We finished our ‘coring’ today.  All of the penetrations through our concrete floor (between the ground floor and lower level) were completed.  The technician from Penhall Company did a great job.  He was courteous, fast, professional, safe and fun.

Most of the locations where we were coring were over walls in the lower level (basement) so Al and his team have lots of ‘clean up’ to complete where the framing had to be removed.  No problem – Al will piece it back together quickly.

The beautiful thing is that our plumbing team, Wenger Plumbing, can return to our site and complete the rough plumbing.  This is the predecessor task to completing the electrical, hydronic heating/cooling, central vacuum and other tasks.

Daylight is burning – we need to move forward.

Coringthe water supply in the shower wall.

Coring the water supply in the shower wall.

Starting to core an 1-1/2 inch hole ...

Starting to core an 1-1/2 inch hole …

Continuing to core at 1 minute 10 seconds ...

Continuing to core at 1 minute 10 seconds …

Completed at 1 minute 42 seconds!

Completed at 1 minute 42 seconds!

Coring a 5-inch hole for the drain in the tub in the Master Bath. This is a huge hole and, no, we didnt hit the PEX!

Coring a 5-inch hole for the drain in the tub in the Master Bath. This is a huge hole and, no, we didn’t hit the PEX!

Leave a Reply

Your email address will not be published. Required fields are marked *