Pouring Our Concrete Generator Pad

We poured concrete today and it looks great.

And the HRV is now mounted and in place, connected to the exterior supply/exhaust plenum.  The seismic cross-bracing needs to be added and then the interior supply/exhaust can be connected.

We’re getting there …

Al and Nep are finishing the concrete they just poured for the generator pad.

 

The HRV is mounted to the ceiling and connected to the exterior plenum.

 

We used unistrut framing to connect the HRV to the ceiling. This needs to have a cross-brace each way for additional rigidity (seismic).

 

The forms were stripped at the end of the day ... it looks great!