Buttoning Up the Ladder in the Vertical Culvert

We can stroke this one off the list – the ladder inside the vertical culvert is done.  Bryan was at the bottom of the vertical culvert on December 8, 2010.  It feels good to get this element of the project completed.  Finally.

As well, we finished off the solar installation and now we need to get connected to the grid.

Excellent progress …

The ladder and safety post are now mounted securely inside the vertical culvert.

View from the bottom of the vertical culvert (17 feet to the surface).

We put a wooden plywood deck inside the vertical culvert so we could add the electrical and other components safely and quickly.

The cast aluminum ring and manhole cover fit nicely over the vertical culvert.

Panels inside the East Mechanical room ...

 

Panel open with spacers over deadfront, with labeling. Ready for inspection ...

 

Our solar permit, which needs to be signed off and closed.

Although we are connected to the grid, this permit should be closed.

 