More Polishing in the Lower Level
Friday, January 8th, 2010The grinding and polishing in the lower level wrapped up today.
We scheduled the crane to arrive on Monday so we can lift the grinder/polisher out of the lower level, unload a truckload of FSC certified lumber into the lower level and ground floor, move some SIPs and then start framing.
The polished concrete in the lower level looks fantastic.




