Integrating Our Drainage System

There is no point being ‘weather tight’ until we can move water from our roof to the storm sewer.  Given our desire to harvest all of the rainwater on our roof for landscape irrigation, with our underground cistern, this becomes a bit complicated.  Like our entire project … Rainwater Capture System – Design Overview When […]

Completing Our ‘Cool Roof’

The five-person team from Statewide Roofing left our job site at 4:30 pm, after completing the white membrane on the upper-, mid- and lower flat roofs.  Manny, from MWB Pools, arrived on site today and worked with Izzy, the master trencher, on installing the 6-inch pipe that will take our overflow water when our underground cistern […]

Installing Our ‘Cool Roof’ System – Day 3

We were extremely focused on completing the installation of the single ply membrane over our flat roofs today, as the weather forecast for Sunday continues to include a 30% chance of rain. Also, Izzy completed the trench under the sidewalk and to the Verizon (formerly GTE) underground vault on Winchester Boulevard. Trenching to Winchester With […]

Scheduling Our Trench Inspection with PG&E

We finished the trench work for our natural gas and electric service lines from PG&E today.  Bryan called for the first inspection and was fortunate to schedule the appointment for tomorrow (08/04/10).  However, our PG&E Project Manager, Nathan Lee, cautioned us that the next available ‘lay in’ was two weeks out. Meeting with Allan Courtney […]